Top wall

Top wall

Area of application:

  • Water pressure-tight building entry for horizontal connecting cable
  • Prefabricated support plates, adapted at the factory to the probe manifolds to be installed, for pressurized water-tight building penetration through the concrete walls of the building
  • Installation on site directly into the neutral fiber of the concrete wall/floor slab before concreting
  • Water pressure-tight after the concrete has hardened

Basic equipment:

  • Formwork system (plywood) complete with height 500 mm (for direct integration)
  • Wall thickness up to 400 mm (must be specified)
  • Pipes from DA32 – DA50 (freely selectable)
  • Threaded rods V2A
  • U-rails 40 mm x 20 mm x 5 mm, 15 mm PE panel, swelling tape on center panel (one-sided)
  • Center distance horizontal 130 mm – vertical 200 mm to 300 mm
  • Pipes welded to center plate on one side (during installation, ensure that the swelling strip is facing the outer wall and the reinforcing steel is facing the inner wall)

Advantages:

  • It is not necessary to drill a core hole or use an annular space seal

Selectable options:

  • Number of connections per level
  • Number of levels
  • Swelling band on the pipe penetration
  • Wall collar on the pipe penetration

Delivery form:

  • from 2-fold to 10-fold (manufactured individually according to requirements)