2022
Small series production of the probe anchor.
Development of a rubber-coated blowout pipe for large compressors.
Procurement of a probe camera with a flexible head for inspection through a 90° angle.
2021
Development of new probe bases d55 1-circuit and d63 1-circuit oval for Finland.
Acquisition of the first electric car.
2020
Introduction of new distribution pits such as eco white and eco 480 for standard small-scale systems in a special lightweight design made entirely of plastic.
2019
Expansion and enhancement of the 3D design software.
Commencement of the collaboration with MuoviTech.
2018
Entry of Dominik and Michael Geser into the company.
Inspection of the first EWS exceeding 300 meters in depth in Switzerland using a specialized camera.
2017
Development and production of the GESER probe anchor by Michael Geser as part of his technical project.
2016
Acquisition of 3D design software for planning, development and documentation.
2015
Development and market launch of a probe base for energy piles. A particular challenge was that the probe had to be vibrated into the filled concrete pile.
2014
Development of various bends for the corrugated pipe. Creation of test facilities for Power-Wave probes on the company premises. Commissioning of the third PV system with 21KW peak, entirely for self-consumption of electricity.
2013
Market launch of GESER SmartTight coupling.
Consultation and planning support, and initial product deliveries to a partner company in Kosovo for the construction of the Ministry of Justice, which was a joint project of the country and the EU.
2012
Expansion of the eco-distribution pit system with truck-accessible manhole covers.
Commissioning of the second PV system with 17KW peak.
Consultation and planning support for a partner company in Kosovo for the construction of the Ministry of Justice, a joint project of the country and the EU.
2011
Market launch of the factory-welded probe in the MD system with a CNC-controlled welding machine.
Procurement of a CNC waterjet cutting system to enhance flexibility in the drilling accessories market.
2010
Consultation, training, and supply to a partner company in Kosovo for the creation of a geothermal heating and cooling system for a vocational school funded by the EU.
2009
Market launch of the ‘eco’ distribution pit system.
Commissioning of a fully automatic coil winding machine to provide any customer-specific probe length on short notice.
2008
Relocation to a new building spanning 2,500 sqm for the expansion of probe production.
Commissioning of a thermal solar system for hot water and heating support covering 16 sqm.
2007
Market launch of GESER-egeplast S.I.C.U.R probe and world record with a 706 m deep PE probe.
2006
Relocation of the administration to new premises.
Europe-wide delivery of GESER geothermal probes.
2005
Acquisition of a 5-axis CNC turning-milling center.
Additional drilling companies are fully equipped.
2004
Establishment of metalworking for the production of drilling accessories and tools.
2003
Construction of new production facilities.
Expansion of international deliveries (NL-CN-FR-CZ-IT-HU).
Commissioning of the first PV system with 18KW peak.
2002
Major project involving 40 probes with a distribution system and complete assembly.
2001
First drilling company completely equipped and trained by GESER, ready for operation.
2000
Certification by SKZ according to HR 3.26.
Transition to full-time operation.
1999
Relocation and acquisition of a CNC milling center.
Development of the GESER distribution system.
1998
Hiring of the first employees.
First customers also in Germany and Austria.
1997
Establishment of the garage company on a part-time basis.
Supply and consultation for several Swiss drilling companies.